Contact Us – CM Lodestar Australia
This page is dedicated to identifying a range of 1t & 2t Columbus McKinnon Lodestar D8+ units supplied between 11th October 2023 – 30th October 2024 in Australia.
It has come to our attention that these units may not be lifting their full rated capacity due to a clutch issue identified by the manufacturer. Please note that this does not present a safety concern as the hoist is designed such that the clutch will slip prior to it being overloaded and can be safely lowered.